Guide: Using Asana with Databox
HOW TO
How to connect Asana to Databox
IN THIS SECTION
How to connect Asana to Databox
To connect an Asana Account in Databox, go to Data Sources > + New connection. Type Asana in the search bar and click on the green Connect button.
This will open the Authorization window, which is where you will be prompted to enter your Asana login credentials and authorize the Databox app.
How much historical data is synced when you first connect Asana to Databox?
When you connect a new Asana Data Source in Databox, 10,000 tasks are initially synced.
Certain Metrics may have more or less historical data available. For more information about the amount of historical data available for a specific Metric, please contact our Support Team at [email protected]
Pro Tip: Once your Asana Data Source is connected and actively syncing data, we store the data that's collected in our own database. This allows us to accumulate more data over time as more data syncs are made so that you can report on more historical Asana data in your Databox reports. Learn more here.
What time zone does Asana data sync in?
Asana data is synced in UTC.
What are the API rate limits for Free and Premium Asana Accounts?
How to access pre-built Asana Templates
Pro Tip: Once the Databoard is available on the Databoards page, it is completely disconnected from the public Template. Therefore, you can further customize this Databoard to meet your specific needs using the Designer.
Popular Asana Templates
How to build a Databoard using Asana data
If a pre-built Datablock isn't available for your use case, click on the Visualization Types icon under the Datablock Library icon
Popular Asana Metrics
Tasks Created (Assigned) | Tasks Overdue by Project | Tasks w/o Due Date (in Projects) |
---|---|---|
|
|
|
|
|
|
Tasks Completed by Project | Tasks Completed (In Projects) | Tasks Completed by Assignee |
|
|
|
View a full list of Asana Metrics available in Databox here.
Additional Information
IN THIS SECTION
Metric Considerations
- All "Tasks Completed" Metrics : If tasks are opened and closed multiple times in your Account, the "Tasks Completed" value in Asana may be lower than the "Tasks Completed" value in Databox. If you open and close a given task multiple times in the same day, it would not influence the "Tasks Completed" count.
- "Contact Conversation Rate by Source:" Comparison data is only available for the "Previous Period." "Same Period Last Year" comparisons are not supported for this Metric.
- Tasks Created (Assigned): If tasks are created and not assigned in the same day, the "Tasks Created (Assigned)" value would not be increased in Databox. This is because "Tasks Created" data is synced with Databox based on the Create Date.
Integration Considerations
-
All Metrics that contain "(Project)" and "(Assigned)": "Project" and "Assigned" Metrics are limited to a maximum of 500 Projects/ Assigned Tasks. If there are 501 Projects in your Account, the 501st will not be recognized by Databox.
For all other Metrics, a maximum of 10,000 results are synced with Databox.